We execute a large number of EPC Projects combining Civil Works, S&T Works and Electrical Works under a single tender for various railway zones specially for ABS, KAVACH work, and other EI work.
Param Enterprises Private Limited take complete responsibility for the procurement of RDSO-certified materials, rigorous testing, and comprehensive installations of all items on outdoor and indoor systems, required for traffic movement under Indian Railways including satisfactory clearance by the Commissioner of Railway Safety (CRS).
Technical Capabilities
Key Differentiators
Our Procurement Partners
We leverage a robust network of industry-leading OEMs and RDSO-approved vendors to supply the highest quality materials for our EPC projects.
Process Workflow Visualization
Design and Scheme Approval
Signalling and Interlocking Plan (SIP), Route Section Plan, Selection Table, Panel-face / VDU Diagram, Interface Circuit & Logic Circuit.
Procurement & Inspection
Procurement of RDSO approved items and inspection, alongside certified procurement of non-RDSO approved items and testing.
Installation of S&T Gear
Outdoor track equipment, point machines, signal units, location boxes, cable trenches, and indoor apparatus room setup.
Integrated Wiring
Precision relay rack wiring, power rack cabling, IPS & battery bank connections, and VDU interface integration.
Testing & Simulation
Rigorous Factory Acceptance Tests (FAT), Site Acceptance Tests (SAT), and comprehensive software logic simulation tests.
Commissioning & Handover
Non-interlocking execution, statutory safety sanction from the Commissioner of Railway Safety (CRS), and live handover.
Featured EPC Turnkey Projects
Pradhankhunta – Manpur Automatic Signalling Work (234 kms)
Jaipur Division (4 Section) Automatic Signalling Work (174 kms)
Sanand – Samakhiyali Automatic Signalling Work (219 kms)
Udhna – Jalgaon Automatic Signalling Work (306 kms)
Kanpur – Jhansi Automatic Signalling Work (217 kms)
Anuppur – New Katni Automatic Signalling Work (166 kms)
Bhopal Div. Automatic Signalling Work (139 kms)
Ghaziabad – Moradabad Automatic Signalling Work (231 kms)
Discuss Your Next EPC Turnkey Project?
Contact Param Enterprises to explore how our turnkey capabilities map perfectly to your upcoming railway infrastructure goals.